At Dawson Foundation Engineering, we are often asked what level of site investigation is required before a piled foundation can be designed.
A site investigation is a crucial part of pile design because it provides information about the ground beneath the proposed development. This allows the engineer and piling contractor to select a foundation solution that is safe, practical and appropriate for the site.
Without reliable ground information, it can be difficult to determine the correct pile type, diameter, depth or installation method. Unexpected ground conditions may also result in delays, design changes and additional costs once work has started.
A site investigation is carried out to establish the ground conditions beneath a proposed development.
Depending on the project, the investigation may provide information about:
This information helps establish whether conventional shallow foundations are suitable or whether a piled foundation is required.
The first purpose of a site investigation is to understand what lies beneath the proposed structure.
Ground conditions can vary considerably, even across a relatively small site. One part of a development may contain firm natural ground, while another area may contain fill, disturbed material or weaker soils.
A site investigation can help determine:
Where a site contains fill, disturbed material or buried obstructions, a specialist foundation solution may be required. Read our guide to piling in made ground to learn how these conditions can affect pile selection, depth and design.
There is no single piling method that is suitable for every site.
The ground investigation findings help the engineer determine which systems can safely and practically achieve the required foundation performance.
Potential piling methods may include:
For example, a site with suitable cohesive soils and sufficient access may be appropriate for CFA piling. A restricted-access or low-headroom site may require a sectional or mini-piling system. Ground containing cobbles, boulders, buried concrete or other obstructions may require a specialist drill-and-case method.
Choosing the correct pile type at the design stage helps avoid specifying an installation method that is unsuitable for the ground or impractical for the site.
Pile depth and diameter cannot be selected using a standard specification for every development.
The required design will depend on:
Where weak or unsuitable soils extend to greater depth, longer piles may be required to transfer the loads into stronger ground below.
Reliable ground information allows the pile length and diameter to be designed more accurately, reducing the likelihood of unnecessary material use or changes during installation.
Groundwater can influence both pile selection and the installation process.
The investigation may identify:
Understanding groundwater conditions in advance allows the piling method and installation sequence to be planned appropriately.
This is particularly important for bored piling systems, where bore stability and concrete placement must be carefully controlled.
Previously developed sites may contain old foundations, buried slabs, concrete, masonry, cobbles, boulders or other obstructions.
These materials can prevent driven or augered piles from reaching the required depth and may result in refusal or damage to the installation equipment.
If the investigation identifies difficult or obstructed ground, a method such as overburden drill and case piling may be considered.
Our guide to ODEX piling explains how steel casing can be installed through difficult overburden before forming a pile within more competent material beneath.
The purpose of a piled foundation is to transfer the loads from the proposed structure safely into suitable ground.
A site investigation helps identify conditions that could affect the long-term performance of the foundation, including:
This information allows the foundation to be designed around the actual site conditions rather than assumptions.
Correct pile selection and design help reduce the risk of excessive movement, differential settlement or foundation failure after construction.
A suitable site investigation can reduce uncertainty before piling begins.
Without reliable ground information, the project may encounter:
Site investigation does involve an initial project cost, but it can help prevent significantly more expensive changes after construction work has started.
It also supports more accurate budgeting by allowing the piling contractor to prepare a quotation based on the likely pile type, quantity, depth and installation requirements.
Read more about the factors that influence piling costs.
Ground investigation information may also be required by structural engineers, building control teams and third-party warranty providers.
The available information helps demonstrate that the foundation design is based on the site conditions and that the proposed piling system is appropriate for the development.
Providing the relevant ground and structural information early can reduce the risk of queries, design revisions or approval delays later in the project.
The information required will vary according to the project, but useful documents can include:
The more complete the available information, the easier it is to assess the likely piling requirements and prepare an appropriate proposal.
Where no site investigation information is available, it may not be possible to design or accurately price a piled foundation with confidence.
Assumptions about the ground can lead to an unsuitable pile specification, inaccurate quantities or unexpected changes during installation.
In some cases, an initial site visit can help identify practical access and installation considerations. However, a visual inspection cannot establish the full ground profile or replace appropriate investigation.
The level of investigation should be proportionate to the size, complexity and risk of the project.
Ground investigation is not limited to large commercial developments.
Residential extensions and new-build properties can also encounter:
Where traditional foundations are unsuitable, mini piling, screw piling or bottom driven piling may be considered.
Read more about when mini piling may be required for a house extension.
Commercial projects often involve larger structural loads, wider building footprints and more complex ground conditions.
The site investigation can help inform:
Visit our Commercial Piling page for more information about our capabilities.
A suitable site investigation provides the information required to select, design and price a piled foundation with greater confidence.
At Dawson Foundation Engineering, we can review the available ground investigation information, structural drawings, load requirements and access constraints before recommending an appropriate piling solution.
If you are unsure whether the available information is sufficient, our team can advise on what may be required before the foundation design is finalised.
To discuss your project, call 0333 224 5196 or contact our team to arrange a free site visit and no-obligation quotation.